Petestack Blog

1 August 2018

Cockpit locker false floor

Filed under: Sailing — admin @ 5:09 pm

So what can I tell you about Fly’s cockpit lockers? In 26 words, cavernous hellholes of peeling paint on dirt on paint on dirt still awaiting a good clean back and not seen at their worst in these photos! Today I cut out the starboard locker’s plywood false floor identified last October as rotten, non-structural and surplus to requirements since we installed the inboard and haven’t needed a level base for a petrol tank in there since 2001. There’s one little corner to tidy up in the angle between side wall and cockpit bulkhead, but really a pretty clean job when I’d expected some minor glasswork to be necessary somewhere.

Note the slight bulge below the drain tube in the first two photos but gone in the last, which had no port-side counterpart and turned out to be holding a vertical piece of ply to support the false floor where the front of the central locker (ex-outboard well) angles up to meet the bulkhead.

No Comments

No comments yet.

RSS feed for comments on this post.

Sorry, the comment form is closed at this time.

Blog powered by WordPress. Feedback to webmaster@petestack.com.